Shipboard zones, offshore modules and critical circuits
Marine & Offshore Cable Solutions for Vessels and Platforms
Map ship and platform areas to the required electrical function, fire strategy and environmental exposure. This solution separates normal power and instrumentation routes from emergency, earthing, deck and special offshore cable systems.
- Vessels and machinery spaces
- Deck and platform modules
- RFOU, BFOU, UX and SW4

Choose by system duty, not by name alone
Use this page to narrow the cable route before comparing a product model or submitting a specification.
Start with the equipment
Identify the machine, circuit function, route and the consequence of cable failure at that location.
Define the complete duty
State voltage or transmission needs together with movement, bending, load, fluids, temperature and installation exposure.
Confirm one construction
Review conductor or fibre elements, screens, reinforcement, sheath, termination, standards and documentation as one schedule.
Match the cable to the equipment and route
Cable selection changes by ship zone and service. Machinery spaces, open deck, accommodation, emergency routes and platform process modules do not share the same fire, mud, oil or mechanical requirements.
Machinery spaces
Power, control and instrumentation routes around motors, pumps, generators and switchboards with heat, oil and vibration exposure.
Open deck and exposed routes
Cable runs subject to salt, UV, water, abrasion and mechanical protection requirements.
Emergency and safety systems
Critical circuits where fire resistance and circuit integrity must be defined separately from normal flame-retardant routes.
Offshore process modules
Power, control and signal systems exposed to mud, hydrocarbons, compact tray space and project documentation requirements.
Accommodation and service zones
Low-smoke, halogen and flame requirements coordinated with vessel design and installation rules.
Umbilical and special routes
Combined power, control, data or video connections for underwater and special offshore equipment.
Define the conditions that control cable life
The cable family follows the vessel area, circuit criticality and named standard. Confirm fire performance, mud resistance and approvals at model level instead of treating all marine cables as interchangeable.
Separate cables that limit flame spread from constructions intended to maintain a circuit during a specified fire test.
Identify NEK 606 mud resistance, hydrocarbon contact, seawater, UV and washdown conditions by route.
Check tray fill, bend radius, armor, braid, glands, vibration and exposed deck protection.
State class, flag, yard, owner, IEC, NEK or BS requirements before product approval is discussed.
Compare suitable cable-family routes
Use vessel zone and circuit function to narrow the family, then confirm voltage, conductor size, screen, armor, fire behavior and applicable documentation.
RFOU power and instrumentation
Flame-retardant, low-smoke offshore routes for normal power, control and instrumentation duty where NEK 606 is specified.
View RFOU cableBFOU fire-resistant circuits
Mica-based circuit integrity route for emergency and critical systems where the required fire test is named.
View BFOU P105 cableUX earth cables
Dedicated earthing and grounding routes for offshore systems, checked for conductor size, sheath and project documentation.
View UX earth cableSW4 shipboard cables
Marine power and control routes following BS-style construction requirements where SW4 is specified by the project.
View SW4 cableShipboard power and control
IEC 60092-related power and control cable families for machinery, service and deck systems.
Browse marine cablesUmbilical and special offshore
Combined data, video, control and power routes designed around underwater equipment and termination needs.
View CDUR01 umbilicalTurn the application into a cable selection route
Use the matrix to identify the next technical route. Final construction follows the complete project schedule and operating inputs.
| Equipment or Route | Cable System | Inputs to Confirm | Selection Route |
|---|---|---|---|
| Normal offshore power route | RFOU power cable | Voltage, cores, armor, mud/oil exposure, LSZH and NEK 606 document scope | RFOU family |
| Emergency power or control | BFOU fire-resistant cable | Circuit duration, exact fire test, voltage, support system and termination | BFOU P105 |
| Offshore instrumentation | RFOU pair or triad cable | Pairs/triads, screen, armor, noise risk, mud resistance and gland system | RFOU instrumentation |
| Platform earthing | UX earth cable | Conductor size, route, sheath, bonding method and project standard | UX P108 |
| Shipboard BS route | SW4 marine cable | Voltage, construction, armor, fire behavior and BS project requirement | SW4 family |
| Underwater equipment link | Umbilical or special cable | Power/data elements, water depth, tensile member, connector and length | CDUR01 route |
Engineering and test references
References are selected for the confirmed construction and project duty. The quotation and inspection plan define the applicable methods, conditions and acceptance values.
Reference 1
NEK 606 cable families reviewed for the exact edition, mud requirement and model scope named by the project.
Reference 2
IEC 60092 shipboard electrical cable requirements confirmed by circuit type and vessel zone.
Reference 3
BS 6883, BS 7917 or SW4-related requirements used only where specified by the yard or project.
Reference 4
Class, flag, owner and yard documentation confirmed before manufacturing and inspection planning.
From operating data to an agreed cable schedule
The process keeps equipment, cable construction, interfaces and documentation aligned before production.
Share the operating duty
Provide the equipment, electrical or transmission services, movement, route and environment.
Review the cable route
Separate circuit functions and compare the constructions that fit the operating duty.
Confirm the technical schedule
Agree the construction, dimensions, interfaces, standards, inspection stages and document list.
Manufacture and inspect
Production, marking, packing and agreed inspection follow the confirmed order specification.
Frequently asked questions
Short answers to common questions before a project-specific cable review.
How are RFOU, BFOU, UX and SW4 routes compared?
They are construction families used for different vessel and offshore duties and should not be treated as interchangeable labels. Compare voltage, circuit function, fire strategy, armour, mud or oil exposure, installation zone and the exact project standard.
What is the difference between flame retardance and circuit integrity?
Flame retardance limits flame propagation under a stated test. Circuit integrity addresses continued operation for a specified circuit and test condition. Emergency routes must be defined by the project fire strategy.
When is armoured marine cable considered?
Armour may be selected where the installation needs mechanical protection or a specified construction system. Glands, bonding, corrosion exposure, bend limits and route geometry should be reviewed with the armour choice.
What should a marine cable enquiry include?
Send the vessel or module area, circuit function, voltage, conductor or pair count, armour and screen, fire and smoke requirements, mud, oil, salt and temperature exposure, route, length, quantity and documentation list.
Send the inputs needed for a useful cable review
Include the information available now. Drawings, old cable markings, cross-section photos and project specifications can be attached through the enquiry form.
- Vessel or platform area: machinery, deck, accommodation, emergency route or process module
- Cable family: RFOU, BFOU, BU, RU, UX, SW4, shipboard or umbilical
- Voltage, conductor size, cores, pairs, triads, screen and armor
- Flame, fire-resistant, low-smoke, halogen, mud, oil, UV and seawater requirements
- NEK 606, IEC 60092, BS 6883, BS 7917, class, yard or project specification
- Installation route, glands, terminations, bend radius and tray constraints
- Required approval, certificate, inspection and test document list
- Length, quantity, drum, packing, marking and delivery country