



TEF, TEC-2C & TEH Tubing-Encapsulated Fiber-Optic & Dual-Core PDHG Downhole Cable (1/4 in)
TEF tubing-encapsulated fiber-optic (downhole FIMT), TEC-2C dual-conductor and TEH hybrid electro-optical permanent downhole cables hermetically seal 2 to 12 carbon-polyimide DTS/DAS optical fibres and/or 18 to 16 AWG fluoropolymer-insulated copper gauge cores (1,000 to 1,700 V DC) inside welded-and-drawn 316L stainless steel or UNS N08825 Alloy 825 tubing (3.18 to 6.35 mm OD, 11×11 mm PVDF/FEP encapsulation, 138 to 303 MPa, -40 to 300 °C).
TEF tubing-encapsulated fiber-optic (downhole FIMT), TEC-2C dual-conductor and TEH hybrid permanent downhole monitoring cables clamp directly onto production tubing strings via cross-coupling protectors, delivering full-wellbore Distributed Temperature and Acoustic Sensing (DTS/DAS) plus 1,000 to 1,700 V DC Permanent Downhole Gauge (PDHG) power/telemetry at pressures from 138 MPa (20,000 psi) to 303 MPa (44,000 psi) and temperatures from -40 °C to 300 °C.
Permanent outside-tubing completions fail when annular H2S/CO2 gas permeates polymer jackets or casing doglegs crush unarmoured control lines during run-in. TEBAOFLEX double- and triple-tube TEF designs enclose 2 to 12 polyimide- or hermetic carbon-polyimide-coated single-mode, multimode or pure-silica-core fibres inside an inner 1.80 to 3.18 mm stainless FIMT surrounded by a cold-drawn 6.35 mm (1/4 in, 0.71 to 1.24 mm wall) 316L or UNS N08825 Alloy 825 outer tube (with an optional 1.02 mm aluminum layer blocking hydrogen 100x more effectively above 150 °C). Extruding an 11.0 x 11.0 mm square PVDF, PP or FEP/PFA jacket — or unitizing TEC + TEF alongside two 4.0 mm galvanized/316L bumper wires in an 11.0 x 24.0 mm flatpack — absorbs run-in impact and hydraulic-fracturing vibration.
Specify TEF-125 or TEF-250 for optical-only DTS/DAS completions, TEC-250-2C for redundant dual-wire PDHG and intelligent-completion valve circuits, or TEH-250 / TEH-FP-1124 when combining quartz pressure gauges and optical sensing in a single clamp pass. For single-core 1/4 in electrical gauge/power tubing see our TEC Tubing Encased Downhole Cable, or for winch-deployed logging cables see our 4SSA27 & FIMT-EO Wireline Cable (MOQ 50 m, 7 to 45 working days).
Explore the oil, gas and petrochemical cable range for related configurations.
TEF, TEC-2C & TEH Tubing-Encapsulated & Flatpack Downhole Construction
Each TEBAOFLEX permanent downhole cable is formed from longitudinal laser-welded, 100% eddy-current-tested and hydrostatic-verified 316L or UNS N08825 Alloy 825 strip drawn to precise outer diameter and wall tolerances for orbital-weld-free completion integrity.

| Component | Material and construction |
|---|---|
| 1A. Optical Sensing Core (TEF & Hybrid TEH Builds) | Two to twelve single-mode (ITU-T G.652.D / pure-silica-core) or 50/125 µm multimode fibres with high-temperature polyimide (150–200 °C) or hermetic carbon-polyimide / metal coatings (260–300 °C), loose-buffered in hydrogen-scavenging gel inside an inner 1.80 to 3.18 mm (0.071 to 0.125 in) laser-welded 316L stainless-steel FIMT. |
| 1B. Dual or Hybrid Copper Gauge Conductors (TEC-2C & TEH Builds) | One or two solid or 7-wire stranded annealed/tinned copper (ASTM B 33) or Class 10 nickel-coated copper (ASTM B 355) conductors in 18 AWG or 16 AWG, insulated with high-dielectric ETFE, FEP or PFA fluoropolymer (rated 1,000 to 1,700 V DC, >= 2,000 MΩ·km at 500 V DC) and stabilized with high-temperature polymeric buffer tape/filler. |
| 2. Optional Aluminum Hydrogen-Permeation Barrier (300 °C TEF-250-HT300) | Seamless 1.02 mm (0.040 in) concentric aluminum barrier layer swaged between inner and outer metal tubes on > 150 °C SAGD steam and geothermal TEF builds, reducing molecular hydrogen ingress by two orders of magnitude without organic polymers. |
| 3. Outer Pressure-Bearing 316L or Alloy 825 Metal Tube | Welded-and-drawn 3.18 mm (1/8 in, 0.41–0.61 mm wall) or 6.35 mm (1/4 in, 0.71 mm / 0.028 in, 0.89 mm / 0.035 in, or 1.24 mm / 0.049 in wall) tube in 316L stainless steel (UNS S31603) for sweet wells or UNS N08825 (Alloy 825) for H2S/CO2/high-chloride sour completions. |
| 4. Square 11x11 mm Encapsulation or Multi-Line Bumper Flatpack | Abrasion- and chemical-resistant 11.0 x 11.0 mm square (or 6.35 / 11.0 mm round) outer encapsulation in PP (125 °C), PVDF (150 °C), FEP (205 °C) or PFA (260 °C), or a unitized 11.0 x 24.0 mm flatpack locking 1/4 in TEC + 1/4 in TEF between two 4.0 mm crush-bumper wires for rapid cross-coupling clamping. |

TEF / TEC-2C / TEH-FP Permanent Downhole Model Code Breakdown
- TEF / TEC-2C / TEH: Tubing-Encapsulated Fiber-optic (TEF), Dual-Conductor electrical Tubing-Encapsulated Cable (TEC-2C), or Hybrid Electro-Optical (TEH) permanent downhole monitoring line
- 125 / 250 / FP-1124: outer pressure tube nominal diameter in 1/1000ths of an inch (0.125 in = 3.18 mm, 0.250 in = 6.35 mm) or 11.0 x 24.0 mm dual-line bumper-wire flatpack
- DT / TT / HT300: double-tube (DT), heavy triple-tube (TT) or 300 °C all-metal concentric aluminum hydrogen-barrier (HT300) optical FIMT architecture
- 316L / 825: cold-drawn laser-welded tube metallurgy: austenitic 316L stainless steel (UNS S31603) for sweet wells or UNS N08825 Alloy 825 for sour H2S/CO2/chloride wells
- SQ11 (PVDF / FEP / PFA): 11.0 x 11.0 mm square polymer outer encapsulation engineered to lock into cross-coupling protectors and absorb completion run-in crush/impact
TEF & PDHG Permanent DTS/DAS, Intelligent Completion & SAGD Applications
Install TEF, TEC-2C and TEH permanent downhole cables clamped outside production tubing, casing strings or velocity strings across onshore unconventional, offshore subsea, thermal SAGD, geothermal and CCUS injection wells.

- Permanent Distributed Temperature Sensing (DTS) and Distributed Acoustic Sensing (DAS) along horizontal multi-stage hydraulic fracturing, waterflood/gas-lift allocation and CCUS CO2 plume monitoring wells.
- Dual-conductor redundant Permanent Downhole Gauge (PDHG) quartz pressure/temperature transducers and surface-controlled intelligent-completion interval control valves (ICV).
- Single-pass hybrid electro-optical completions (TEH-250 and TEH-FP-1124 flatpack) simultaneously powering bottomhole electronic gauges and recording continuous wellbore DTS/DAS profiles.
- 260 °C to 300 °C Steam-Assisted Gravity Drainage (SAGD) heavy-oil wells, deep HPHT sour gas completions (UNS N08825 Alloy 825) and engineered geothermal reservoirs.
TEF & Dual-Core PDHG vs Single-Core TEC vs Retrievable Wireline FIMT
| Downhole Cable Family | Deployment Method | Core & Barrier Architecture | Primary Wellbore Duty |
|---|---|---|---|
| TEF / TEC-2C / TEH Flatpack (this page) | Permanently clamped outside tubing string | 2–12F FIMT, 2C 18/16 AWG Cu or Hybrid in 316L / Alloy 825 + 11x11 mm PVDF | Permanent reservoir DTS/DAS, dual-circuit PDHG & intelligent completions |
| Single-Conductor 1/4 in TEC Cable | Permanently clamped outside tubing string | 1 x 18 or 16 AWG Cu + ETFE/FEP in 6.35 mm 316L / Alloy 825 tube | Single-line DC power and digital telemetry for standard bottomhole gauges |
| 4SSA27 & FIMT-EO Wireline Logging Cable | Retrievable winch spooling via grease head | Central SS FIMT + optional Cu inside double contra-helical SWA | Short-term intervention DTS/DAS fracture diagnostics & optical wireline runs |
| Sour-Service Monoconductor / Heptacable | Retrievable winch spooling under well pressure | 1C or 7C copper inside bare preformed S75 / MP35N double wire armour | Live-well cased-hole perforating, PLT & open-hole formation evaluation |
Never deploy polymer-encapsulated TEF/TEC on a dynamic wireline logging winch; conversely, bare stranded wireline cables cannot provide a hermetic gas-tight barrier through permanent wellhead tubing hangers.
TEF, Dual-Core TEC & Hybrid PDHG Flatpack RFQ Ordering Checklist
- Completion architecture: optical-only TEF (DTS/DAS), dual-conductor electrical TEC-2C (PDHG/ICV), single-tube hybrid TEH-250, or multi-line bumper-wire flatpack (TEH-FP-1124).
- Metal tube outer diameter, wall thickness and alloy: 1/8 in (3.18 mm) or 1/4 in (6.35 x 0.71 / 0.89 / 1.24 mm) in 316L stainless steel or UNS N08825 Alloy 825 (state H2S/CO2/Cl- levels).
- Optical fibre count/type (SM G.652.D, pure-silica-core SM or 50/125 µm MM; polyimide vs carbon-polyimide coating) and/or copper gauge count, AWG size and DC voltage.
- Outer encapsulation geometry and polymer: bare metal tube (for wellhead feedthrough), 11.0 x 11.0 mm square PVDF (150 °C), FEP (205 °C), PFA (260 °C) or 11.0 x 24.0 mm flatpack.
- Maximum bottomhole temperature/pressure, continuous orbital-weld-free length per reel (MOQ 50 m) and required delivery window (7 to 45 working days).
Related selection resources
- Oil, gas, wireline and permanent downhole completion cable catalog
- Oil and gas drilling, offshore and downhole cable selection guide
- Single-Conductor 1/4 in TEC Tubing-Encased Downhole Gauge & Power Cable
- 4SSA27 & FIMT-EO Retrievable Double-Armoured Fiber-Optic Wireline Logging Cable
- Sour-Service H2S Corrosion-Resistant Alloy Downhole Wireline Cable
- Engineering guide: Monoconductor vs Quad vs Heptacable & Optical Downhole Cables
TEF Tubing-Encapsulated Fiber-Optic & PDHG Cable Frequently Asked Questions
What is the difference between TEF (Tubing-Encapsulated Fiber) and TEC (Tubing-Encapsulated Conductor) downhole cables?
TEF encloses 2 to 12 hermetically protected single-mode or multimode optical fibres inside double or triple laser-welded 316L or Alloy 825 metal tubes for continuous Distributed Temperature and Acoustic Sensing (DTS/DAS), whereas TEC houses 1 or 2 fluoropolymer-insulated copper conductors (1,000 to 1,700 V DC) for Permanent Downhole Gauge (PDHG) power; hybrid TEH cables integrate both inside one 6.35 mm tube or 11x24 mm flatpack.
When is UNS N08825 (Alloy 825) required instead of 316L stainless steel for 1/4 in TEF and PDHG downhole tubing?
316L stainless steel (UNS S31603) is suited to sweet oil, water-injection and low-chloride geothermal wells below chloride stress-corrosion thresholds, whereas UNS N08825 Alloy 825 (38–46% Ni, Cr-Mo-Cu stabilized per ASTM B 704 and ISO 15156-3) is mandatory whenever H2S sour gas, CO2 carbonic acid or hot concentrated chloride brines risk pitting or sulphide stress cracking.
How do TEF downhole fiber-optic cables prevent hydrogen darkening above 150 °C to 300 °C?
Up to 150–200 °C, TEF cables combine hydrogen-scavenging gel, pure-silica-core single-mode glass and hermetic carbon-polyimide fibre coatings inside double laser-welded metal tubes; from 150 °C to 300 °C (such as SAGD steam wells), TEF-250-HT300 adds a 1.02 mm concentric aluminum barrier whose hydrogen permeability is roughly 100 times lower than stainless steel.
Why is an 11 mm x 11 mm square PVDF encapsulation preferred on TEF and PDHG tubing-clamped completions?
11.0 x 11.0 mm square PVDF encapsulation seats flat and non-rotating inside cast or stamped cross-coupling protectors across every tubing joint, absorbs run-in casing impact and frac-fluid vibration up to 150 °C, resists H2S/methane/aromatics, and strips cleanly at the wellhead using standard 11 mm square encapsulation strippers.
What are the minimum order quantity and splice-free length options for TEF and dual-core PDHG cables?
50 m minimum order quantity (MOQ), with a factory lead time of 7 to 45 working days covering both 50 to 500 m wellhead/test assemblies and continuous orbital-weld-free 3,000 to 9,000 m completion drums.
TEF, TEC-2C & TEH Dimensional, Collapse-Pressure & Thermal Schedule
TEF & PDHG Key Tube Alloy, Pressure, Temperature & Encapsulation Summary
- Three permanent completion families: Optical-only TEF (1/8 in & 1/4 in double/triple FIMT), dual-core electrical TEC-2C (2x18 / 2x16 AWG) and hybrid electro-optical TEH / flatpack
- Sweet & H2S sour metallurgy: Cold-drawn laser-welded 316L stainless steel (UNS S31603, ASTM A 632) or UNS N08825 Alloy 825 (ASTM B 704, ISO 15156-3 sour service)
- HPHT & SAGD thermal tiers: 150 °C (PVDF/PP encapsulation), 200 to 260 °C (FEP/PFA fluoropolymer) and 300 °C all-metal aluminum hydrogen-permeation barrier TEF
- Crush-resistant completion profiles: Bare 3.18 mm (1/8 in) and 6.35 mm (1/4 in) tubing, 11.0x11.0 mm square PVDF/FEP encapsulation, or 11.0x24.0 mm bumper-wire flatpack
- Splice-free & custom drum supply: Minimum order quantity 50 m (from test/wellhead pigtails to continuous orbital-weld-free completion spools) in 7 to 45 working days
| Parameter | Value |
|---|---|
| Rated voltage | 1,000 V DC to 1,700 V DC on TEC-2C and hybrid TEH copper gauge cores (optical-only dielectric sensing on TEF FIMT models) |
| Tube dimensions and metallurgy | 1/8 in (3.18 mm) and 1/4 in (6.35 mm, 0.028 / 0.035 / 0.049 in wall) cold-drawn 316L stainless steel or UNS N08825 Alloy 825 |
| Encapsulation and flatpack profiles | Bare metal tube, 6.35 to 11.0 mm round, 11.0x11.0 mm square PVDF/PP/FEP/PFA, or 11.0x24.0 mm dual-line flatpack with 4.0 mm bumper wires |
| Operating pressure and temperature | 138 MPa (20,000 psi) working and up to 303 MPa (44,000 psi) tube collapse rating across -40 °C to 150 °C, 200 °C, 260 °C and 300 °C tiers |
| Minimum bend radius and supply | 320 mm to 450 mm dynamic installation bend radius with MOQ 50 m and 7 to 45 working days factory lead time |
| Optical fibre and hydrogen protection | 2 to 12 SM (G.652.D / pure-silica-core) or MM fibres with carbon-polyimide coating, H2-scavenging gel or aluminum barrier |
| Factory NDE and dielectric testing | 100% inline eddy-current weld inspection, hydrostatic/nitrogen pressure test, OTDR trace (1310/1550 nm) and >= 2,000 MΩ·km IR at 500 V DC |
TEF, TEC-2C & TEH Permanent Downhole Cable Dimensional, Pressure & Thermal Schedule
| Model & Completion Type | Outer Tube Size & Wall | Internal Optical / Copper Core | Encapsulation Profile | Temp. Rating (°C) | Working | Collapse Pressure (MPa) | Weight | Min. Bend (kg/km | mm) | Next step |
|---|---|---|---|---|---|---|---|
| TEF-125-DT 1/8 in Double-Tube FIMT | 3.18 x 0.41 mm (316L / 825) | 2–6 SM/MM carbon-PI fibres + H2 gel | Bare 3.18 mm or 6.35 mm PVDF | -40 to +200 | 138 | 145–207 | 32–74 | 320 | Request this size |
| TEF-125-TT 1/8 in Triple-Tube FIMT | 3.18 x 0.61 mm (316L / 825) | 2–6 SM/MM carbon-PI fibres + H2 gel | Bare 3.18 mm or 6.35 mm PVDF | -40 to +200 | 172 | 220–303 | 42–84 | 320 | Request this size |
| TEF-250-SQ11 1/4 in Double-Tube TEF | 6.35 x 0.89 mm (0.035 in WT) | 3.18 mm SS FIMT (2–12 SM/MM fibres) | 11.0 x 11.0 mm Square PVDF / PP | -40 to +150 | 138 | 190 | 245 | 350 | Request this size |
| TEF-250-HT300 1/4 in All-Metal H2-Barrier | 6.35 x 0.71 mm + 1.02 mm Al | 2.39 mm SS FIMT (2–8 pure-silica/C-PI) | Bare 6.35 mm or FEP/PFA jacket | -40 to +300 | 138 | 172 | 144–230 | 380 | Request this size |
| TEC-250-2C18 1/4 in Dual-Core PDHG | 6.35 x 0.89 mm (316L / 825) | 2 x 18 AWG Cu (1,000 V DC, ETFE/FEP) | 11.0 x 11.0 mm Square PVDF | -40 to +200 | 138 | 190 | 268 | 350 | Request this size |
| TEC-250-2C16-HT 1/4 in HPHT PDHG | 6.35 x 1.24 mm (0.049 in 825) | 2 x 16 AWG Ni-Cu (1,000 V DC, PFA) | 11.0 x 11.0 mm Square FEP / PFA | -40 to +260 | 172 | 240 | 332 | 380 | Request this size |
| TEH-250-1C18-FO 1/4 in Hybrid PDHG+TEF | 6.35 x 0.89 mm (316L / 825) | 1 x 18 AWG Cu + 1.80 mm SS FIMT (2–6F) | 11.0 x 11.0 mm Square PVDF | -40 to +150 | 138 | 190 | 258 | 350 | Request this size |
| TEH-FP-1124 Dual PDHG+TEF Flatpack | 2 x (6.35 x 0.89 mm Alloy 825) | 1C/2C PDHG TEC + 4–12F TEF + 2x4 mm wire | 11.0 x 24.0 mm PVDF / FEP Flatpack | -40 to +200 | 138 | 190 | 625 | 450 | Request this size |
316L vs UNS N08825 Alloy 825 Tube & Polymer Encapsulation Selection Matrix
| Tube / Polymer Code | Material & Standard Basis | Continuous Temp. Window | Chemical & H2S / Brine Limit | Primary Completion Environment |
|---|---|---|---|---|
| 316L SS (UNS S31603) | Cold-drawn laser-welded austenitic SS (ASTM A 632) | -40 to +260 °C (tube) | Sweet oil/gas, low chloride, CO2 waterflood | Land unconventional frac monitoring, geothermal & water injection |
| Alloy 825 (UNS N08825) | Ni-Fe-Cr-Mo-Cu-Ti alloy (ASTM B 704 / ISO 15156-3) | -40 to +300 °C (tube) | High H2S partial pressure, hot chloride brine & acid | Offshore subsea trees, deep sour gas, HPHT & CCUS injection |
| PP / TPV Encapsulation | Impact-grade copolymer polypropylene or TPV | -40 to +125 °C | Aqueous completion brines & moderate hydrocarbons | Cost-effective shallow-to-medium land DTS/DAS & gauge wells |
| PVDF Square (11x11 mm) | High-modulus polyvinylidene fluoride (abrasion grade) | -40 to +150 °C | H2S, CO2, methane, diesel, aromatics & frac sand | Standard offshore/onshore Cross-Coupling Protector clamp runs |
| FEP / PFA Encapsulation | Melt-extruded perfluorinated fluoropolymer | -40 to +205 °C (FEP) / +260 °C (PFA) | Extreme sour fluids, steam condensate & solvents | Deep HPHT gas, SAGD thermal recovery & high-enthalpy geothermal |
Pressure values distinguish continuous completion working pressure (138 to 172 MPa / 20,000 to 25,000 psi) from cold-worked metal-tube collapse pressure calculated from tube yield strength and D/t wall ratio; final pressure, orbital-weld policy and clamp spacing are confirmed on the quotation drawing.
All 11.0 x 11.0 mm square and 11.0 x 24.0 mm flatpack encapsulations are dimensioned for standard oilfield encapsulation strippers and cast/stamped cross-coupling cable protectors.
Minimum order quantity is 50 m with a manufacturing lead time of 7 to 45 working days, available from short wellhead crossover test lengths up to continuous splice-free 3,000 to 9,000 m completion reels.
ASCII part references for BOM and ERP entry: TEF-125-DT; TEF-125-TT; TEF-250-SQ11-316L; TEF-250-SQ11-825; TEF-250-HT300; TEC-250-2C18-316L; TEC-250-2C18-825; TEC-250-2C16-HT; TEH-250-1C18-FO; TEH-FP-1124; TF-TEF-PDHG-DOWNHOLE.
TEF & PDHG ASTM B 704 / A 632 Tube Metallurgy & Optical Test Standards
| Standard or specification | Application |
|---|---|
| ASTM B 704 / ASTM B 751 (UNS N08825 Alloy 825) | Welded nickel-iron-chromium-molybdenum-copper alloy tubing specification and general NDE test requirements for sour-service downhole control and monitoring lines. |
| ASTM A 632 (UNS S31603 / 316L Stainless Steel) | Small-diameter seamless and welded austenitic stainless-steel tubing dimensional and mechanical standard for sweet-well TEF and TEC-2C encapsulation. |
| ISO 15156-3 / NACE MR0175 | Metallurgical selection reference for cracking-resistant nickel-base Alloy 825 tubing exposed to H2S-containing production fluids. |
| ASTM B 33, ASTM B 355 & ITU-T G.652.D | Tinned and Class 10 nickel-coated copper gauge conductors plus single-mode optical transmission baseline for permanent PDHG and DTS/DAS completions. |
Certifications and document support
TEBAOFLEX ISO 9001 quality management, eddy-current tube NDE, hydrostatic and OTDR test records
ISO 15156-3 — Cracking-resistant CRAs and UNS N08825 nickel-base alloys for H2S oil and gas service
Related cable options
Compare these cable options by service combination, movement, load, voltage and transmission requirement.
TEC Tubing Encased Downhole Cable for Gauge and Power Lines
A related cable option for a different application or duty profile.
View product4SSA27 & FIMT-EO Armoured Fiber-Optic & Hybrid Electro-Optical Wireline Logging Cable (DTS / DAS)
A related cable option for a different application or duty profile.
View productHigh Temperature Wireline Cable
A related cable option for a different application or duty profile.
View productRequest a cable recommendation and quotation
Send the required services, cable length, mechanical duty, environment, termination and quantity. Our team will review the application before quoting.
- Include the product name or SKU plus the required cable length and quantity.
- Attach a specification, drawing or data sheet when available.





