SBD-SWA Seabed Drilling Rig, Vibrocorer, CPT & Deep-Sea Mining Steel-Armoured Umbilical Cable
SBD-SWA seabed drilling, vibrocorer, cone penetration testing (CPT) and deep-sea mining umbilical cables (4SSA49, 23SSA33, A305532, A304267, 4L-A304493 and A304613, 10.6 to 65.4 mm OD) combine 600 V to 6.6 kV subsea motor power cores, screened sensor quads and optical fibres beneath 2-layer, 3-layer or 4-layer contra-helical steel wire armour rated 89 to 1,014 kN breaking strength.
SBD-SWA steel-armoured seabed drilling, vibrocorer, seafloor CPT and deep-sea mining umbilical cables deliver 600 V to 6.6 kV motor power, real-time geotechnical sensor telemetry and high-speed optical video/data while supporting 89 to 1,014 kN mechanical lifting and recovery loads from geotechnical vessels and offshore mining support ships.
Unlike free-flying ROVs that hover above the bottom, seafloor geotechnical frames — including high-frequency vibrocorers, seabed cone penetrometer (CPT) rigs, robotic rotary rock drills and tracked polymetallic-nodule or trenching crawlers — land directly on rock outcrops, shell beds and cohesive marine clay. When cores jam or mud suction grips a landed frame, recovery pullouts spike far above static submerged weight while drill vibration excites severe bending fatigue at the bellmouth termination. TEBAOFLEX manufactures SBD-SWA umbilicals in both 2-layer preformed contra-helical steel wire armour (such as 23SSA33 at 26.8 mm / 280 kN) and heavy 4-layer torque-balanced steel wire armour (4L-A304493 class at 45.6 mm / 645 kN up to A304613 at 65.4 mm / 1,014 kN), with longitudinal water-swelling tapes and optional extruded HDPE or hydrolysis-resistant PUR outer jacketing.
Select SBD-SWA multi-layer steel-armoured umbilicals for seafloor coring, geotechnical rock drilling, subsea foundation piling and tracked mining/plough machinery. For standard ROV + TMS deployment winches see our EOM RM-Series Main-Lift Umbilicals, or for open-pit surface blasthole drills choose our terrestrial Blast-Hole Drilling Mast Cable.
Explore the marine, offshore and shipboard cable range for related configurations.
SBD-SWA 2-to-4 Layer Steel-Armoured Seabed Drilling Umbilical Construction
Built directly on TEBAOFLEX's multi-layer subsea armouring lines, SBD-SWA constructions pair longitudinally water-blocked XLPE/HDPE/ETFE power and sensor cores with 2 to 4 opposing layers of preformed galvanized steel wire armour.

| Component | Material and construction |
|---|---|
| 1. Subsea Motor & Pump Power Conductors | Tinned or bare flexible copper conductors (17 AWG / 1.0 mm² probe power up to 34 x heavy 6 to 35 mm² motor feeders) insulated with XLPE, HDPE or ETFE for 600 V, 1,000 V, 3.3 kV or 6.6 kV subsea hydraulic and vibration drives. |
| 2. Geotechnical Sensor Pairs, Quads & Coaxes | Individually foil-and-drain screened twisted pairs/quads (0.50 to 1.5 mm²) and 35 to 75 Ω coaxial elements transmitting CPT tip-resistance, pore-pressure, inclinometer and rotary drill torque telemetry without VFD crosstalk. |
| 3. Optical Telemetry Unit (FIMT or Tight-Buffered) | Single-mode (9/125 µm) or multimode (50/125 µm) optical fibres enclosed in stainless-steel FIMT micro-tubes or heavy HDPE buffer sheaths for real-time HD subsea camera and sonar monitoring. |
| 4. Longitudinal Water-Blocking & Inner Bedding | Water-swelling semi-conductive/non-woven tapes and void fillers under an extruded UV/hydrolysis-resistant HDPE or polyurethane inner sheath preventing axial seawater migration if snagged on bedrock. |
| 5. 2-Layer to 4-Layer Preformed Contra-Helical SWA | Two, three or four concentric opposing layers of preformed high-tensile galvanized steel wires providing extreme pullout reserve (up to 1,014 kN), rock-crush immunity and zero-spin seabed touch-down. |
| 6. Optional Polymeric Outer Abrasion Jacket | Available as bare lubricated steel wire armour (4SSA49, 23SSA33, 4L-A304493) or over-extruded with smooth high-density polyethylene (HDPE, A305532) or polyurethane (PUR) to shed sticky seabed clay. |

SBD-SWA & SSA/A304 Geotechnical Umbilical Code Breakdown
- SBD-SWA: Seabed Drilling Steel-Wire-Armoured hybrid power, telemetry and optical lift umbilical engineered for seafloor touchdown and breakout loads
- 4SSA49 / 23SSA33: 10.6 mm (89 kN) light CPT probe and 26.8 mm (280 kN, 7x4+4x1+2x2x1+2x0.5+6SM) vibrocorer double-preformed steel-armoured reference builds
- 4L-A304493: 4-layer contra-helical galvanized steel wire armoured deepwater rotary seabed drill build (45.6 mm OD, 645 kN breaking strength)
- A304267 / A304613: large-count multi-power electro-optical seabed drill and tracked deep-sea mining crawler umbilicals rated 596 kN to 1,014 kN
SBD-SWA Seabed Rock Drill, Vibrocorer, CPT & Deep-Sea Mining Applications
Deploy SBD-SWA 2-to-4 layer steel-armoured umbilicals across offshore wind foundation surveys, subsea pipeline route coring, deepwater rock drilling and seabed mineral collection trials.

- High-frequency marine vibrocorers (3 m, 6 m and 12 m barrel frames) and heavy box/piston corers requiring single-cable lift + 400–1,000 V motor power.
- Seabed Cone Penetration Testing (CPT) rigs and offshore wind monopile geotechnical site-investigation frames operating in 50 to 3,000 m water depth.
- Remotely operated seafloor rotary rock drills coring 50 to 200 m into continental-shelf and deep-ocean hard rock formations.
- Tracked deep-sea polymetallic nodule collectors, seafloor massive-sulfide (SMS) cutters and heavy subsea trenching ploughs.
SBD-SWA Seabed Drilling Umbilical vs ROV Main-Lift vs Surface Drill Cable
| Cable Family | Armour & Jacket Architecture | Water-Blocking & Crush Resistance | Target Drilling / Mining Environment |
|---|---|---|---|
| SBD-SWA 2–4 Layer Subsea Umbilical (this page) | 2- to 4-layer contra-helical preformed SWA (bare or HDPE/PUR) | Full hydrostatic + swelling tape waterblock (89–1,014 kN) | Submerged vibrocorers, seabed CPT rigs, seafloor rock drills & crawlers |
| EOM RM-Series ROV Main-Lift (UMB02) | 2- or 3-layer high-tensile SWA optimized for AHC sheaves | FIMT + gelled core (185–880 kN) | Suspended work-class ROV + TMS garage deployment winches |
| OMB Electro-Hydraulic Umbilical (ID 6020) | PUR sheath + synthetic braid over 350 bar hydraulic hoses | Subsea fluid + low-voltage signal bundle | Subsea tools driven by topside hydraulic power packs via hoses |
| Blast-Hole Drilling Mast Cable (ID 7447) | Unarmoured ultra-flex rubber/TPU mast festoon cable | Surface weather/oil resistant only (not hydrostatic) | Dry open-pit mine rotary blasthole drill rig mast loops |
Never deploy unarmoured surface mining trailing cables or hose-only bundles as load-bearing seafloor corer lift lines; seabed breakout suction requires preformed multi-layer contra-helical steel wire armour.
SBD-SWA Seabed Drilling & Vibrocorer Umbilical RFQ Specification Checklist
- Seafloor tool type: vibrocorer, seabed CPT rig, rotary seafloor rock drill, subsea plough or tracked deep-sea mining crawler.
- Single-cable lift mode vs separate hoist wire, submerged tool weight (kg), estimated seabed breakout pull (kN) and maximum water depth (m).
- Motor/pump voltage (400 V, 690 V, 1,000 V, 3.3 kV or 6.6 kV), phase current (A), VFD drive details and sensor pair/quad/coax count.
- Optical fibre count and mode (SM 9/125 µm or MM 50/125 µm) plus FIMT vs tight-buffered preference.
- Armour preference: 2-layer vs 4-layer contra-helical steel wire armour, bare steel exterior vs smooth HDPE or PUR outer jacket.
- Winch drum barrel diameter, sheave groove diameter, required cut length (MOQ 50 m; lead time 7 to 45 working days) and termination socket interface.
Related selection resources
- Marine, offshore and subsea cable catalog
- Custom subsea drilling, corer and mining umbilical manufacturing
- RM-Series & EOM Torque-Balanced Steel-Armoured ROV Main-Lift Umbilical Cable
- RS726 & RS935 Work-Class ROV, Pontoon & Topside Deck Umbilical Cable
- Seabed Ocean-Observation & Borehole Sensing Subsea Composite Cable
- Engineering guide: matching armoured umbilical diameter to geotechnical winch grooves & sheaves
- Project record: 41.0 mm OD multi-layer steel-armoured marine umbilical build
SBD-SWA Seabed Drilling & Vibrocorer Umbilical Frequently Asked Questions
When is 4-layer contra-helical steel wire armour specified on an SBD-SWA seabed drilling umbilical?
4-layer contra-helical steel wire armour (such as SBD-SWA 4L-A304493) is specified when heavy seafloor rotary rock drills or deepwater coring frames require > 500 kN breaking strength alongside finer individual wire gauges for tighter sheave bending, superior zero-torque landing stability and extra radial rock-impact protection.
Can an SBD-SWA vibrocorer or CPT umbilical lift the equipment directly without a separate steel hoist wire?
Yes. SBD-SWA 23SSA33 provides a 280 kN breaking strength and 70 kN maximum safe working load (~7.1 tonnes) in a single 26.8 mm hybrid power-and-optical cable, allowing vibrocorers and seabed CPT frames to be deployed, powered and recovered on one winch drum.
Should a seabed drilling or corer umbilical use bare steel armour or an extruded HDPE / PUR outer jacket?
Bare preformed galvanized steel armour (4SSA49, 23SSA33) maximizes winch heat dissipation, cuts hydrodynamic drag and resists sharp rock cuts; add an extruded smooth HDPE or PUR outer jacket (A305532) when operating in sticky cohesive marine clay where mud clings between bare wires or where topside traction winches require a polymeric grip surface.
How does SBD-SWA 23SSA33 prevent seawater from flooding topside or subsea junction boxes if snagged?
2 longitudinal swelling water-blocking tape barriers (around the inner control cores and beneath the HDPE inner sheath) expand immediately on contact with seawater, sealing interstitial pathways across the 7x4 mm² power, 4x1 mm² control, 2x2x1 mm² screened pair and 6-fibre core.
What are the minimum order quantity and manufacturing lead time for SBD-SWA seabed drilling umbilicals?
50 m minimum order quantity (MOQ), with a factory lead time of 7 to 45 working days tailored to offshore geotechnical survey schedules (including 150 to 500 m continental-shelf winch lengths and multi-kilometer deep-sea reels).
SBD-SWA Dimensional, Breaking-Load & Geotechnical Model Specifications
SBD-SWA Key Multi-Layer Armour, Voltage & Pullout Summary
- 2- to 4-layer SWA builds: Double, triple and quad contra-helical galvanized steel wire armour for high-vibration seafloor coring and rocky seabed drag
- Wide geotechnical range: From 10.6 mm / 89 kN CPT probes and 26.8 mm / 280 kN vibrocorers up to 65.4 mm / 1,014 kN deep-sea mining crawlers
- Bare or jacketed armour: Supplied as bare preformed steel armour for maximum winch heat dissipation or over-jacketed in HDPE / PUR / TPE against mud suction
- Water-blocked hybrid core: Longitudinal swelling tapes + gelled FIMT or HDPE-buffered single-mode/multimode fibres preventing water hosing after jacket cuts
- Project-engineered supply: Custom conductor/sensor/fibre layups built from MOQ 50 m in 7 to 45 working days for marine survey and mining contractors
| Parameter | Value |
|---|---|
| Rated voltage | 600 V to 1000 V AC on vibrocorer and CPT builds; 1.8/3.0 kV to 3.8/6.6 kV available on heavy seabed drill and mining crawlers |
| Armour layer configurations | 2-layer preformed contra-helical SWA (89 to 400 kN) and 3-to-4 layer heavy torque-balanced SWA (596 to 1014 kN) |
| Outer diameter and weight range | 10.6 mm (461 kg/km air) for light CPT probes up to 45.6–65.4 mm (4392–8367 kg/km seawater) for heavy seabed drills and crawlers |
| Water-blocking and jacket options | Swelling water-blocking tapes + gelled FIMT; bare galvanized steel wire exterior or extruded HDPE / PUR / TPE outer sheath |
| Bend radius and supply terms | 200 to 980 mm minimum dynamic bend radius depending on OD; MOQ 50 m with 7 to 45 working days manufacturing lead time |
| Operating temperature envelope | -20 °C to +70 °C (standard HDPE/XLPE corer builds) or -40 °C to +80 °C (ETFE/FIMT deepwater probe builds) |
| Pullout safety margin | 4:1 typical dynamic working-load ratio (for example 280 kN MBL / 70 kN max working load on 23SSA33) to absorb seabed clay breakout suction |
SBD-SWA Seabed Drilling, Vibrocorer, CPT & Mining Crawler Umbilical Schedule
| Model & Core Summary | Nominal Outer Diameter (mm) | Armour & Exterior Finish | Rated Power Voltage | Mass Air | Seawater (kg/km) | Min. Dynamic Bend Radius (mm) | Breaking | Max Working Load (kN) | Next step |
|---|---|---|---|---|---|---|---|
| SBD-SWA 4SSA49 (2x17AWG+2SM FIMT) | 10.6 | 2-Layer Preformed SWA (Bare) | 1000 V | 461 | 371 | 200 | 89 | 22.25 | Request this size |
| SBD-SWA 23SSA33 (7x4+4x1+2x2x1+2x0.5+6SM) | 26.8 | 2-Layer Preformed SWA + Waterblock | 1000 V AC | 2066 | 1580 | 530 | 280 | 70.0 | Request this size |
| SBD-SWA A305532 (22-Core Drill Control) | 30.0 | 2-Layer SWA + Extruded HDPE Jacket | 1000 V AC | 2650 | 1890 | 600 | 400 | 100.0 | Request this size |
| SBD-SWA A304267 (32P+16S+4Coax+7MMF) | 43.6 | Multi-Layer SWA (Bare Lift) | 3000 V AC | 4950 | 3768 | 870 | 596 | 149.0 | Request this size |
| SBD-SWA 4L-A304493 (15P+3S+9SM 4-Layer) | 45.6 | 4-Layer Contra-Helical SWA (Bare) | 3300 V AC | 5720 | 4392 | 910 | 645 | 161.0 | Request this size |
| SBD-SWA A304613 (34P+8MMF+4SMF Crawler) | 65.4 | Multi-Layer Heavy Crawler SWA | 3300–6600 V | 10850 | 8367 | 1300 | 1014 | 253.0 | Request this size |
Seabed Tool Armour Layer & Jacket Selection Matrix
| Seafloor Tool Category | Recommended Armour Build | Exterior Finish | Primary Mechanical Hazard Mitigated |
|---|---|---|---|
| Light Seabed CPT & Heat-Flow Probe | 2-Layer Preformed SWA (10.6–18 mm OD) | Bare galvanized steel wire | Compact survey winch spooling + high depth-to-drag ratio |
| Marine Vibrocorer & Box Corer (3–12 m) | 2-Layer Heavy Preformed SWA (24–30 mm OD) | Bare SWA or smooth HDPE jacket | High-frequency motor vibration + clay breakout pullout spikes |
| Robotic Seafloor Rotary Rock Drill | 3- or 4-Layer Torque-Balanced SWA (38–48 mm OD) | 4-Layer bare SWA or thick PUR jacket | Zero-spin landing accuracy + extreme radial crush on rocky ledges |
| Tracked Deep-Sea Mining & Trenching Plough | Multi-Layer SWA up to 1,014 kN (45–66 mm OD) | Bare heavy GIPS or abrasion-locked PUR | 100–250 kN tow/lift loads + abrasive polymetallic nodule contact |
Preformed galvanized steel armour wires (as used on SBD-SWA 4SSA49 and 23SSA33) remain locked in place when cut or locally nicked, preventing strand unravelling during deck termination or rough seafloor coring cycles.
When specifying a seabed corer or CPT umbilical that serves simultaneously as the single lifting hoist line (single-cable mode without a separate steel hoist wire), verify that Maximum Working Load exceeds submerged frame mass plus estimated seabed mud breakout suction.
Minimum order quantity is 50 m with a production lead time of 7 to 45 working days, supporting offshore wind geotechnical campaigns (100 to 600 m shallow-shelf winches) as well as 3,000 to 5,000 m deep-ocean exploration reels.
ASCII part references: SBD-SWA 4SSA49; SBD-SWA 23SSA33; SBD-SWA A305532; SBD-SWA A304267; SBD-SWA 4L-A304493; SBD-SWA A304613; 4-layer steel wire armoured subsea drilling cable.
SBD-SWA Subsea Geotechnical Umbilical Standards & Test References
| Standard or specification | Application |
|---|---|
| ISO 13628-5 & Marine Geotechnical Umbilical Practice | Contra-helical steel wire armour load-sharing, torque balance and dynamic bend-over-sheave mechanical design. |
| IEC 60228 & IEC 60502-1 / 60502-2 | Stranded copper conductor DC resistance (for example <= 5.09 Ω/km on 4.0 mm² XLPE power cores in 23SSA33) and AC/DC dielectric routine testing. |
| ITU-T G.652.D / IEC 60794-1-2 | Optical attenuation and hydrostatic crush qualification on single-mode and multimode optical telemetry fibres. |
| Longitudinal Water-Blocking Integrity | Swelling water-blocking tapes across core layers restricting axial seawater ingress toward subsea junction boxes and slip rings. |
Certifications and document support
TEBAOFLEX ISO quality assurance and routine dielectric/optical factory test reports
ISO 13628-5 — Subsea umbilical mechanical, electrical and optical verification reference
Related cable options
Compare these cable options by service combination, movement, load, voltage and transmission requirement.
Heptacable 7H42, 7J46 & W7 7-Conductor Double-Armoured Wireline Logging Cable (1–1.5 kV DC)
A related cable option for a different application or duty profile.
View product4H18, A240 & 6SSA5 4-Conductor Quad & Multi-Core Borehole Geophysical Logging Cable (300–1200 V)
A related cable option for a different application or duty profile.
View product4SSA27 & FIMT-EO Armoured Fiber-Optic & Hybrid Electro-Optical Wireline Logging Cable (DTS / DAS)
A related cable option for a different application or duty profile.
View productRequest a cable recommendation and quotation
Send the required services, cable length, mechanical duty, environment, termination and quantity. Our team will review the application before quoting.
- Include the product name or SKU plus the required cable length and quantity.
- Attach a specification, drawing or data sheet when available.