Case 27 · Steelmaking & Metallurgy · Factory QA, Hydrostatic & MTC Testing Record
4,000 mm² Rotary & 4,500 mm² EAF Water-Cooled Cable Factory QA, Hydrostatic & MTC Testing Record
When electric arc furnace (EAF) and ladle-furnace operators procure 4,000 mm² to 4,500 mm² water-cooled secondary cables, purchasing decisions rarely hinge on brochure claims—they hinge on verifiable factory release data before ocean shipment. This engineering quality record compiles verified factory acceptance measurements across two heavy-current water-cooled cable configurations: an 8-piece batch of 4,000 mm² × 9,900 mm rotary (swivel) water-cooled cables tested to 1.0 MPa for 30 minutes, and a 6-piece heavy EAF batch (4,500 mm² × 10,500 mm and 11,100 mm) held at 0.8 MPa for 12 hours with a measured 17.29 µΩ assembly DC resistance and piece-by-piece 8-hole forged terminal metrology.

1. Verified Batch Profiles & 5-Document Export QA Dossier
Every export shipment of TEBAOFLEX water-cooled and rotary furnace cables can ship with a TEBAOFLEX-headed 5-document Factory QA & Material Traceability Dossier covering Certificate of Conformity (CoC), Hydrostatic Pressure Test Report, Final Assembly Inspection Report, Piece-by-Piece Terminal Dimensional Sheet and Incoming Raw-Material MTCs.
| Verification Parameter | Batch Profile A — Rotary Water-Cooled Cable | Batch Profile B — Heavy EAF Water-Cooled Cable |
|---|---|---|
| Cable configuration | Rotary (swivel-head) water-cooled secondary cable | Heavy-duty EAF water-cooled secondary power cable |
| Cross-section & length | 4,000 mm² × 9,900 mm (8-piece matched set) | 4,500 mm² × 10,500 mm (4 pcs) & 11,100 mm (2 pcs) |
| Hydrostatic proof protocol | 1.0 MPa (10 bar) held 30 minutes at 35 °C — Zero leakage | 0.8 MPa (8 bar) held 12 hours at 35 °C — Zero leakage |
| Outer-sleeve insulation test | > 10 MΩ via megohmmeter (spec ≥ 10 MΩ) | > 10 MΩ via megohmmeter (spec ≥ 10 MΩ) |
| Assembly DC resistance | Verified within design resistance limit via micro-ohmmeter | 17.29 µΩ (0.0000172863 Ω) measured on 4,500 mm² × 10.5 m |
| Stranded copper lay pitch | 1.4 m measured (acceptance window 0.8 to 1.6 m) | 1.2 m measured (acceptance window 0.8 to 1.6 m) |
| Non-magnetic hardware check | Direct magnet test — zero attraction (austenitic stainless) | Direct magnet test — zero attraction (austenitic stainless) |
| Overall length & head check | ±50 mm length tolerance; full drawing dimensional verification | 305 ± 2 × 40 ± 1 mm pad, 8-φ18 ± 1 mm holes, 3-G1″ ports |
Download TEBAOFLEX Sample 5-Document QA & MTC Dossier (PDF)
Review the exact TEBAOFLEX-headed export inspection package issued per order—including CoC format, 1.0 MPa / 0.8 MPa hydrostatic curves, Clauses 4.3–4.11 inspection matrix, 8-piece terminal metrology table and copper/EPDM MTC summaries.
Download Sample QA & MTC Dossier PDF (4 Pages)2. Hydrostatic Pressure Hold Testing (1.0 MPa × 30 min & 0.8 MPa × 12 h)
Entire-assembly hydrostatic pressure testing verifies forged copper cooling chambers, crimped hose collars and rotary swivel seals before shipment—applying either 1.0 MPa for 30 minutes on rotary assemblies or 0.8 MPa for 12 hours on heavy 4,500 mm² EAF leads with zero pressure drop.


In steelmaking secondary circuits, cooling water typically circulates at 0.35 to 0.60 MPa. Testing finished rotary assemblies at 1.0 MPa (10 bar) provides a high-margin seal verification across dynamic swivel joints and outer hose braids, while holding 4,500 mm² EAF assemblies at 0.8 MPa for 12 consecutive hours exposes microscopic capillary seepage that short bench tests can miss. For full flow-rate, delta-T and pressure-drop sizing formulas, see our water-cooled cable sizing, flow and resistance testing guide and EAF water-cooled cable failure modes and torsion guide.
3. Final Inspection Clauses (4.3–4.11) & 8-Piece Forged Terminal Metrology
Beyond hydrostatic pressure tightness, final assembly inspection checks non-magnetic stainless fasteners, 0.8–1.6 m helical rope pitch, outer-sleeve insulation above 10 MΩ, micro-ohm resistance (17.29 µΩ on 4,500 mm² × 10.5 m) and every bolt hole and cooling thread on the forged copper pads.
| Clause | Inspection Item & Requirement | Inspection Method | Verified Batch Record |
|---|---|---|---|
| 4.3 | Purchased components carry conformity certificates | Audit of incoming batch CoCs & MTCs | Verified for copper rope, copper bar & hose |
| 4.4 | Terminal copper (YS/T 649 / GB/T 13808), copper rope (GB/T 3952) & sleeve (HG/T 2184) | Mill certificate & material test sheet review | All three material families compliant |
| 4.5 | All non-copper metallic clamps and fasteners must be non-magnetic stainless steel | Direct permanent-magnet attraction test | Zero magnetic attraction confirmed |
| 4.8 | Stranded copper rope helical lay pitch between 0.8 m and 1.6 m | Calibrated tape measurement during assembly | 1.2 m (EAF 4,500 mm²) · 1.4 m (Rotary 4,000 mm²) |
| 4.9 | Finished assembly withstands hydrostatic hold without leaks or hose bulging | Full-assembly water-circuit pressurization | 1.0 MPa × 30 min & 0.8 MPa × 12 h — PASS |
| 4.10 | Outer rubber insulating sleeve insulation resistance ≥ 10 MΩ | Hand-cranked megohmmeter check | > 10 MΩ across outer sleeve |
| 4.11 | Total assembly DC resistance below design limit | Four-wire Kelvin micro-ohmmeter measurement | 17.29 µΩ (0.0000172863 Ω) on 4,500 mm² × 10.5 m |
| Dim. | Pin-to-pin length deviation within ±50 mm; pad geometry per drawing | Steel tape, vernier calipers & thread gauges | All assemblies inside drawing tolerance |
| Piece # | Pad W b (305±2) | Thk s (40±1) | m1 (65±1) | m2 (65±1) | m3 (65±1) | Holes (8-φ18±1) | Ports (3-G1″) | k (76.5±1) | v (110±1) | t (72.5±1) | Face c (50±1) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 305.0 | 40.2 | 65.5 | 65.0 | 64.9 | φ18.1 | 3-G1″ | 76.5 | 110.0 | 72.5 | 50.0 |
| 2 | 305.2 | 40.0 | 65.5 | 65.5 | 65.0 | φ18.2 | 3-G1″ | 76.6 | 110.1 | 72.0 | 49.9 |
| 3 | 305.2 | 40.2 | 65.0 | 65.5 | 64.8 | φ18.0 | 3-G1″ | 76.4 | 110.3 | 72.6 | 49.8 |
| 4 | 305.5 | 40.5 | 64.7 | 64.8 | 65.0 | φ18.3 | 3-G1″ | 76.2 | 110.5 | 72.7 | 49.7 |
| 5 | 304.9 | 39.5 | 65.1 | 65.2 | 65.0 | φ18.5 | 3-G1″ | 76.3 | 110.0 | 71.5 | 50.5 |
| 6 | 304.8 | 39.9 | 64.8 | 65.3 | 64.9 | φ18.1 | 3-G1″ | 76.2 | 110.5 | 71.7 | 50.2 |
| 7 | 304.5 | 39.8 | 64.9 | 64.7 | 64.9 | φ18.0 | 3-G1″ | 76.4 | 110.3 | 72.5 | 50.0 |
| 8 | 305.0 | 40.0 | 65.0 | 65.0 | 65.0 | φ18.2 | 3-G1″ | 76.5 | 110.2 | 72.6 | 50.1 |
4. Incoming Raw-Material Traceability (Copper Rope, T2 Bar & NR/EPDM Sleeve)
Upstream lot traceability spans all three load-bearing material groups: TJR 400 mm² stranded copper rope measured at 0.0443 Ω/km at 20 °C, T2 H04 terminal bar stock at Cu ≥ 99.95%, and reinforced NR/EPDM sleeves withstanding 3,000 V AC / 50 Hz for 5 minutes and 1.2 MPa proof pressure.


| Material Group | Reference Standard / Spec | Verified Physical, Chemical & Dielectric Results |
|---|---|---|
| Soft stranded copper rope (TJR 400 mm²) | GB/T 12970-2009 · 30 × 19 / 0.95 mm | Right-hand lay · inner lay ratio 19.7 (≤ 20) · outer lay ratio 11.8 (≤ 12) · 20 °C DC resistance 0.0443 Ω/km (limit ≤ 0.0462 Ω/km) |
| Forged terminal copper bar (T2, H04) | GB/T 1527-2017 · 160 mm bar stock | Cu ≥ 99.95% · Zn, Pb, Fe, Sb, Bi, Sn, As, Ni, S, P each ≤ 0.001% · Ag ≤ 0.0007% · dimensional & surface finish PASS |
| NR/EPDM outer cooling sleeve (Φ152 × 9,565 mm) | HG/T 2184 reinforced cooling hose | Working 0.8 MPa · proof test 1.2 MPa · adhesion 7 N/cm (rubber-ply) / 5 N/cm (inter-ply) · 3,000 V AC / 50 Hz × 5 min no breakdown · 65 Shore A · 70 °C × 72 h aging: tensile Δ 3%, elongation Δ 4% |
| Movable protective bumper rings (Φ203 × 150 mm) | NR/EPDM thermal-shielding compound | +200 °C surface radiant heat shielding · 3,000 V AC / 50 Hz × 5 min no breakdown · 65 Shore A · smooth crack-free walls |
5. Related Water-Cooled Assemblies & Engineering Guides
- Water-Cooled Furnace Cable & Secondary-Circuit Manufacturer Hub — complete product matrix, terminal configurations and RFQ portal.
- EAF Water-Cooled Secondary Power Cable & High-Current Water-Cooled Furnace Cable (1,000–7,000 mm²) — custom forged flat-pad, rotary and bumper-ring builds.
- Pipe-Connection & 37° JIC Swivel Water-Cooled Cable, Induction Furnace Power Lead & WC-2C-LR Two-Conductor Coaxial Water-Cooled Cable.
- Water-Cooled Busbar Compensator Expansion Connector — bolted-flange transformer and furnace secondary compensation links.
- Engineering Guides: Sizing, Flow & Resistance Testing · Failure Modes, Torsion & Terminals · Air-to-Water Conversion & Silent I²R Loss.
6. Frequently Asked Questions on Water-Cooled Cable Factory QA
What quality documents ship with TEBAOFLEX export water-cooled and rotary furnace cable orders?
Every TEBAOFLEX export order for water-cooled and rotary (swivel) furnace cables can ship with a 5-document TEBAOFLEX-headed Factory QA & Material Traceability Dossier: (1) Product Certificate of Conformity (CoC), (2) Hydrostatic Pressure Test Report with hold curve, (3) Final Assembly Inspection Report covering non-magnetic stainless fasteners, lay pitch, micro-ohm DC resistance and >10 MΩ outer-sleeve insulation, (4) Piece-by-Piece Terminal Dimensional Inspection Sheet, and (5) Raw-Material MTC Summaries for copper rope, T2 copper terminal bar stock and NR/EPDM hose sleeves.
Why are heavy EAF water-cooled cables tested at 0.8 MPa for 12 hours while rotary assemblies are tested at 1.0 MPa for 30 minutes?
Rotary swivel-joint assemblies face dynamic seal pressure spikes and torsional cycling, so a 1.0 MPa (10 bar) 30-minute entire-assembly proof test verifies immediate seal retention and crimped hose collar integrity at 1.5× to 2× plant manifold pressure. Large 4,500 mm² EAF furnace cables undergo an extended 0.8 MPa (8 bar) 12-hour cooling-circuit endurance hold to expose ultra-slow capillary seepage through thick rubber walls or brazed copper passages prior to ocean crating.
Are factory hydrostatic reports and MTCs the same as UL, VDE or CE product certifications?
No. Large 4,000 mm² to 4,500 mm² custom water-cooled EAF and rotary furnace cables are engineered to customer terminal drawings rather than covered by general UL 62 flexible-cord or VDE 0285 type approvals. Factory QA reports, hydrostatic hold records and raw-material MTCs verify batch conformance under TEBAOFLEX’s ISO 9001:2015 manufacturing system (Certificate No. 244-24-QI-17425-R0-Q); witnessed FAT or third-party inspection (SGS, BV or TÜV) can be arranged per purchase order.
Why must every non-copper clamp and fastener on a 4,000–4,500 mm² water-cooled cable pass a magnet test?
Secondary furnace circuits carry tens of thousands of amperes at 50/60 Hz, generating intense alternating magnetic fields around the cable terminations. Carbon-steel or ferromagnetic stainless clamps suffer severe eddy-current and hysteresis heating that can char the outer rubber hose and loosen crimp seals. Direct magnet verification confirms non-magnetic austenitic stainless steel before shipment.
What minimum order quantity and delivery lead time apply to custom water-cooled cables with full 5-document QA packages?
Heavy-duty EAF and rotary water-cooled furnace cable assemblies are manufactured to order from an MOQ of 1 piece or 1 matched 3-phase set, with a standard production lead time of 7 to 45 working days depending on copper forging tooling, hose extrusion and order inspection requirements.
Specify a Water-Cooled or Rotary Furnace Cable with Full 5-Document QA
Send your terminal drawing, bolt-hole pattern, pin-to-pin length, operating current, manifold pressure and required hydrostatic hold duration. Standard production lead time is 7 to 45 working days (MOQ: 1 piece or 1 matched 3-phase set for heavy EAF/rotary cables).
Request Engineering Quote & QA Plan Download Sample QA PDF